Connections

The proposed CCGT power plant offers good connections to the networks for electricity, gas and water. The power plant will connect into MAVIR’s Sándorfalva substation via a 400 kV overhead electricity line. An underground gas pipeline will connect to the gas network at Kiskundorozsma. Underground water pipelines will run to the river Tisza for the cooling water connection.